|
Price in reference
TO THE VOLUME OR RESIDENTIAL CUBIC METER of work for residential jobs
performed by HOMEPIEMONTE COSTRUZIONI. |
COSTO AL MC €
|
- Ordinary
maintenance residential property MINIMUM JOB
– Intends replacement of floors and coverings with replacement of
bathroom fixtures and/or faucets, internal painting. Electrical and
plumbing systems are only checked with expected placement of one
plumbing fixture and replacement of all electrical fixture covers
(decorative part of the switch). The volume of the demolitions and
transportation to the refuse facility must not exceed 8 cubic meters
(debris). In this case demolition and/or construction of new
interior walls (internal walls of brick and/or separation) is not
included. The issuance of certification for the systems is not
included. The work includes
standard type materials of medium high quality. Primary Italian
brands
|
70
€ |
- Ordinary
maintenance residential property MEDIUM JOB – Intends replacement
of floors and coverings with replacement of bathroom fixtures and/or
faucets, internal painting. Electrical and plumbing systems are only
checked with expected placement of main switch box (inclusive of
magnetic switch) replacement of wires and fixture covers. The
plumbing part includes the placement of three plumbing fixtures
and/or heating (radiators) based on the on site inspections
performed. The volume
of the demolitions and transportation to the refuse facility must
not exceed 12 cubic meters (debris). In this case limited demolition
and/or construction of new interior walls (internal walls of brick
and/or separation) is included within the volume limits indicated
(12 cubic meters of debris). The issuance of certification for the
systems is included. The work
includes standard type materials of medium high quality. Primary
Italian brands
|
80
€ |
- Ordinary
maintenance residential property PARTIAL JOB
– Intends demolition and/or construction of walls with finish
cement covering and final plastering; replacement of interior doors,
replacement of the entire electric and plumbing system, placement of
floors and coverings, wall painting, replacement of bathroom
fixtures and/or faucets.
The volume of the demolitions and transportation to the
refuse facility must not exceed 16 cubic meters (debris). In this
case substantial demolition and/or construction of new interior
walls (internal walls of brick and/or separation) is included within
the volume limits indicated (16 cubic meters of debris). The
issuance of certification for the systems is included. The
work includes standard type materials of medium high quality.
Primary Italian brands
|
110
€ |
- Ordinary
maintenance residential property TOTAL JOB AND/OR RADICAL
– Intends demolition and/or construction of walls with finish
cement covering and final plastering; replacement of interior and
exterior doors, replacement of the entire electric, gas and plumbing
system, autonomous heating system inclusive of furnace and radiators
in aluminum height=70 cm, depth=59mm, placement of floors and
coverings, wall painting, replacement of bathroom fixtures and/or
faucets. The
volume of the demolitions and transportation to the refuse facility
must not exceed 20 cubic meters (debris). The issuance of
certification for the systems is included. The job requires regular
design and thermal zone summary (law 10).The
work includes standard type materials of medium high quality.
Primary Italian brands
|
180
€ |
- New Construction
with approved building permit – Intends new construction for
residential use (villa) or elevation of an existing home with
related underground or semi-underground part included (underground
part not to exceed 2,50 meters). In the event there is no
underground or semi-underground part, this price is reduced by about
20%. The attic level must be added to the project’s residential
volume. The job includes: excavation, sewer connection, electrical
connection, plumbing connection, electrical grounding, roof with
multiple sides in cement with covering in shingles (can be chosen).The
construction is to be considered “turn key”. The type of
materials used is of medium type. The construction includes also
security doors, video surveillance of the perimeter area. Garden
furnishings and any other external work is excluded if outside the
perimeter of the residence. The work includes standard type materials of medium high quality.
Primary Italian brands.
|
400
€ |
|
If
you wish to obtain the exact amount in detail to remodel or build your
home, you must supply a drawing and/or graphic depiction of the project.
(Request
detailed estimate)The cost estimate developed by
HOMEPIEMONTE COSTRUZIONI is free and does not cost the customer
anything |
|
|
|
|
HOW
TO OBTAIN AN APPROXIMATE COST ESTIMATE FOR REMODELLING
Example
01: I need to totally remodel my apartment
Identify
the letter that relates to the remodeling (in this case letter D): price
180E/mc
Know
the area of the residence in reference to
the living area (measure the inside of the
rooms), excluding terraces and/or balconies: multiply this value by the
internal height.
Multiply
the value obtained by the reference price: 180 E/mc
Typical
house of 75 mq (total remodeling) height
of 2,70m = 75 x 2,70 = 202,5 mc x 180 = 36.450 E (home remodeled with
the specifications identified in letter D)
|
|
|
The
reference prices indicated are developed and elaborated by HOMEPIEMONTE
COSTRUZIONI: Arch. Rocco Cafici (Site Manager) and Arch. Strataco’
Angelo (Estimates and calculations).
|
|